Building demand
Use a project-specific heating and cooling load assessment, with the intended operating schedule and indoor conditions.
Equipment selection is one part of a geothermal system. The loop, distribution, controls and operating conditions need to work together.
Discuss your project
Use a project-specific heating and cooling load assessment, with the intended operating schedule and indoor conditions.
Establish the design temperatures, flow requirements and available source conditions before selecting equipment.
Plan isolation, controls, service clearances and the measurements needed to check operation.
Explore equipment typesA geothermal heat pump exchanges heat with the ground or a body of water through a sealed loop of pipe. Vertical boreholes use the least surface area, horizontal trenches need more open ground, and a lake loop needs suitable water close by. Site conditions and the building’s loads decide which option fits.
Plan the installationShare your location, current heating and cooling system, and timing.